May 06

A Design/Build Contract is Open for Bid for Northstar Boulevard: Shreveport Drive to Route 50

Posted on May 6, 2020 at 11:53 AM by Heidi Kellum

In the first quarter of 2020, work on the preliminary design for the Northstar Boulevard: Shreveport Drive to Route 50 project was completed. Currently, the county is accepting contractor bids for a design/build contract. Work on the design phase of the design/build contract is estimated to begin by the end of 2020.

This project will design and construct a new four-lane, median divided segment of Northstar Boulevard from Shreveport Drive to U.S. Route 50. The scope includes a 10 foot wide shared use path on both sides of the roadway, a traffic signal at Route 50 and the realignment of Evergreen Mills Road. 

The project is currently estimated for completion in mid-2024.

For more information about Northstar Boulevard: Shreveport Drive to Route 50, visit the project page.



Jul 09

Current Update: July 2019

Posted on July 9, 2019 at 12:28 PM by Tony Jones

  • A location and design public information meeting was held July 8, 2019 at John Champe H.S. in Aldie. 
  • County staff and design team members were on hand to talk about the design of the roadway, answer questions and accept written comments on the proposed project. 
  • Citizens unable to attend the meeting can access a copy of the public information meeting brochure and/or the comment sheet (materials are available in English and Spanish).
  • Written comments will be accepted through August 7, 2019.
Jul 02

Current Update

Posted on July 2, 2019 at 4:29 PM by Heather Smith

  • The project is currently in the preliminary design phase.
  • A public information meeting for this project will be held on Monday, July 8, 2019 from 6:30 to 8:30 p.m. in the John Champe High School Cafeteria, 41535 Sacred Mountain Street, Aldie, VA 20105. 
  • County representatives and design staff will be present to discuss the project’s design and location, to answer your questions, and receive comments on the proposed project.
  • Conceptual plans and environmental documents will be available for review at the public hearing on July 8, 2019, or at the Loudoun County Department of Transportation and Capital Infrastructure, 101 Blue Seal Drive, Suite 102, Leesburg, VA, 20175.
  • Provide your written or oral comments at the hearing or submit them by August 7, 2019 to Greg Barnes at the address on Blue Seal Drive listed above, or email to the department. Please reference “Northstar Boulevard Extension Project” in the subject line.
  • The anticipated release for the Request for Qualifications is November 2019.
  • The anticipated release of the Request for Proposals is May 2020.  
  • The anticipated date for the roadway being open to traffic is May 2024.