- Home
- Departments & Offices
- Transportation & Capital Infrastructure
- Projects, Studies & Plans
- Northstar Boulevard: Route 50 to Tall Cedars Parkw
Northstar Blvd: Route 50 to Tall Cedars Parkway
Overview
- This project provided for the planning, design, right of way acquisition (ROW) and construction of a segment of Northstar Boulevard, a minor arterial roadway, from John Mosby Highway (Route 50) to Tall Cedars Parkway.
- The plans included the construction of a new signalized intersection on Route 50 located near the Virginia Department of Transportation’s (VDOT) Arcola maintenance area headquarters.
- The project constructed approximately 3,500 feet of four lane median divided minor arterial roadway, with turn lanes at the following intersecting roads: Route 50, Marrwood Drive, and Tall Cedars Parkway. The project also includes 10-foot-wide shared use paths on both sides of the road.
- Traffic signals with pedestrian controls have been installed at the Route 50 and Tall Cedars Parkway intersections as part of this project.
- When open to traffic, this segment of Northstar Boulevard will provide an alternative north/south connection to Route 50, improving capacity and safety on existing roadway networks within the Dulles South area.
- The county is constructing the segment of Northstar Boulevard from Shreveport Drive to Route 50, which will join this segment with the existing roadway in the Brambleton area. View the project page for Northstar Boulevard (Shreveport Dr. to Route 50).
- The $45.8M project budget includes 70% funding from the Northern Virginia Transportation Authority (NVTA).
Ribbon Cutting and Roadway Opening Scheduled for October 19, 2023
Loudoun County, in partnership with the Northern VIrginia Transportation Authority (NVTA) and the Virginia Department of Transportation (VDOT), invites members of the public to attend a ribbon cutting ceremony to celebrate the completion of construction of Northstar Boulevard, Phase II, from Route 50 to Tall Cedars Parkway, on Thursday, October 19, 2023, at 11:00 a.m. The event will take place near the intersection of Northstar Boulevard and Marrwood Drive in Aldie. The new segment of Northstar Boulevard is scheduled to open to traffic following the event. View the invitation for details (PDF).
Current Phase: Substantial Completion
- Learn about project phases and milestones.
- Visit the Capital Projects Active and Planned in Loudoun County interactive map to view projects in your area, including this one.
Stay Informed About This Project
- View all updates for this Northstar Boulevard: Route 50 to Tall Cedars Parkway project.
- Sign up for updates about this project on Notify Me, Blogs category.
Related Documents & Video
- June 6, 2022 Northstar Boulevard Phase 2 Drone Photos (PDF)
- January 2022: Aerial Video: Northstar Boulevard Phase 2 Project Area
- 12-1-21 Northstar Blvd. Phase 2 Pardon Our Dust Meeting (PDF)
- Northstar Blvd. Phase 2 Diagram (PDF)
- Search Board of Supervisors documents for information related to this project.
Contact Us
- If you have questions about this project, email county staff or call 703-737-8624.
Media Inquires
- Email Glen Barbour, Public Information Officer or call 703-771-5086.